Monroe County Key West
International Airport Terminal Expansion

Key West, FL

48,802 SF
Concourse
7
Gates
9
Month Design Schedule

Accommodating Growth Through Terminal Expansion

McFarland Johnson provided planning, programming, engineering design and permitting services for the Key West International Airport Concourse A Terminal Expansion Program. The terminal program will design and construct a new seven-gate Concourse A facility totaling 48,802 sf, and will include space for gates, holdrooms, circulation, concessions, restrooms, TSA, baggage claim and support areas. A new extended passenger bridge located post-security will connect the existing landside terminal building with the new Concourse A. The new concourse will be comprised of a single-story concrete structure that is supported by piers to align with the second level of the existing terminal. The new concourse will remain above storm surge and flood elevations and is open below to accommodate airside operations. MJ developed the initial program validation based upon the review of the Concourse A Schematic design narrative report and the 15% schematic design drawings produced by another consultant. MJ subsequently provided design for the complete facility. The project was progressed to 100% design in just 9 months, with an early construction package to market in only 4 months.