McFarland Johnson Logo and Tag line
Highways banner

Interstate 90 Thruway Pavement Rehabilitation

Onondaga & Cayuga Counties, NY | New York State Thruway Authority
Interstate 90 Pavement Rehabiltation Interstate 90 Pavement Rehabiltation
Interstate 90 Pavement Rehabiltation
Interstate 90 Pavement Rehabiltation

awardProject received the 2011 Transportation Project of the Year Award from both the American Public Works Association's Central NY Branch and New York Chapter.

This project includes preliminary and final design services for the reconstruction of Interstate 90 from milepost 289.3 to 304.5 in Onondaga and Cayuga Counties. MJ provided highway design for the 4.2 mile eastern section of the project. Preliminary design included horizontal alignment design to accommodate for a future third travel lane in each direction; vertical alignment design to minimize roadway cut and improve vertical clearance at overhead structures; roadside design to minimize wetland impacts; and preparation of a Design Report. Final design for the project involved highway design, drainage improvements, stormwater management, roadside design and the development of an extensive traffic control plan that included a traffic management plan and an incident management plan. The project also included the development of contract plans, specifications, and estimates.

Employees Only | Privacy Policy | Site Map                                                               © 2017 McFarland Johnson. All rights reserved.